|
PROJECT / BUILT WORK
Meeting LEED-NC silver criteria, the project proposes a large scale earthwork from the ground displaced during the site preparation, thus minimizing the exportations of material. Site development includes an events plaza and various ecological features within an urban park. Project and site will host the 2010 Quebec Games.
CLIENT
Décarel inc.
YEAR
2007-present |
TEAM
Michel Langevin, Emilie Bertrand-Villemure, Claude Cournoyer, Josée Labelle, Céline Paradis, Georges-Étienne Parent
COLLABORATION
Lapointe Magne et associés
Vinci Consultants |
KEY
|
(1) |
Perspective of planted berm, from boulevard de la Cité, Lapointe magne et associés and NIPpaysage |
|
(2) |
Site plan, NIPpaysage |
|
(3) |
Section, South entrance, NIPpaysage |
|
(4) |
Perspective showing inte-gration of Francine Larivée artwork, NIPpaysage |
|
|
|
|

|
DOWNLOAD IMAGES |
|